High-temperature pre-drying after the leveling tunnel (80–200°C). Dries inside and outside simultaneously for full surface drying — used for thick water-based coats, outdoor weather-resistant metal paint and heavy cement-board coating. Optional upgrade for UV lines.
Dries thick water-based and metal coats right through, so the finish doesn't blister or lift months later.
High-temperature pre-drying after the leveling tunnel (80–200°C). Dries inside and outside simultaneously for full surface drying — used for thick water-based coats, outdoor weather-resistant metal paint and heavy cement-board coating. Optional upgrade for UV lines.
| Model(s) | Model on request |
|---|---|
| Category | Supporting Equipment |
| Temperature | 80–200°C |
| Specification sheet | Available on request |
| Line integration | Supplied stand-alone or synchronized inside a turnkey line |
Tell us the material, panel size and target output and we will confirm the right model, working width and line position — and whether a different station suits you better.
Send an enquiryAlso in Supporting Equipment
Standard drying equipment matched with roller coating, spraying, curtain coating and UV putty filling. Two independently-powered lamps enable single-lamp semi-drying pre-cure and double-lamp full…
View machine →
The first low-temperature pre-treatment tunnel after coating (≤80°C infrared constant-temp control). Self-levels the paint film and evaporates trace solvent/water vapor without full drying —…
View machine →Heavy-duty transfer for long-distance leveling and process connection. Reinforced 3H frame, variable-frequency chain drive. Carries wood doors, aluminum veneers, cement wall boards and wide…
View machine →Tell us your material, output target and budget — we'll propose the right machine or full line.